× Limited Time Offer ! FLAT 20-40% off - Grab Deal Before It’s Gone. Order Now
Connect With Us
Order Now

BSBLDR601 Lead and Manage Organizational Change Assignment Sample

Due - Sunday by 23:59

Task Summary

You need to answer all the written questions correctly.
Your answers must be word processed and uploaded into Canvas.

Assessment criteria for assignment help

All questions must be answered correctly in order for you to be assessed as having completed the task satisfactorily.

Written answer question guidance

The following written questions use a range of “instructional words” such as “identify” or “explain”, which tell you how you should answer the question. Use the definitions below to assist you to provide the type of response expected.

Note that the following guidance is the minimum level of response required.

Solution

1. Explain four events or trends that may impact whether or not organisational objectives are achieved.

The four trends or events, which may impact whether or not organisational objectives are achieved, have been explained below:

• Practices and processes might reduce or increase profit due to additional processes: The practices and processes of the organisations might reduce or increase their profits due to additional processes, due to which the organisational objectives are not achieved. One of the finest examples of additional processes is risk management, due to which the employees of the companies may sometimes fail to achieve their general objectives while identifying and managing risks. Risk management requires providing an integrated perspective to the control, monitoring and evaluation of risks, due to which the simultaneous organisational activities to meet its primary objectives can be affected (Hopkin 2018).

• Demand for flexible workers: In recent times, the demand for flexible workers have been increased so that the organisational objectives can be met more effectively. In this aspect, the example of the Covid-19 pandemic can be given, due to such demand has been increased (Spurk & Straub 2020). The unavailability of such workers is becoming a challenge for the company while meeting the organisational objectives.

• Higher cost of new technology: The cost of new technologies has been increasing rapidly, due to which the organisations are failing to achieve their basic objectives. In this context, the example of stricter safety protocols can be given, due to which one of the most primary business activities to meet the objectives cannot be achieved. Business transformation by implementing new technologies can force companies to change their primary business objectives (Westerman, Bonnet & McAfee 2014).

• Concern regarding long-term service of employees: The concerns of the business firms regarding the long-term services of the employees have been increasing. In this context, the example of the Covid-19 pandemic can also be given. Due to this, the companies are failing to retain their employees due to the unavailability of wages.

2. List at least five existing practices that may be used to guide organisational change.

Five existing practices, which may be utilised for guiding organisational change, have been
listed below:

• Mobilisation of visible and active executive sponsorship: While guiding for organisational change, the leaders play the most crucial role by helping the employees participate within the entire lifecycle of the change (Prosci 2022).

• Application of structured change management approaches: Well-defined and well-structured change management approaches are needed to be applied.

• Open and frequent communication: Open and frequent communication is needed to be established amongst the employees and employers.

• Engagement with front-line staff: The leaders require to engage or involve with the front-line staff so that they can effectively meet the requirements of the customers.

• Engagement and integration with project management: It is also required to integrate and engage with project management.

3. Describe the process to conduct a cost-benefit analysis. In your answer, explain which methods are relevant and useful to complete the particular process step.

A cost-benefit analysis (CBA) can be defined as the procedure of comparing the estimated and projected benefits or opportunities and costs related to a project decision so that the current business perspectives can be determined. It is the systematic procedure for making decisions, which was illustrated by Benjamin Franklin in 1772 (Koopmans & Mouter 2020).

Two important examples of CBA methods are keeping track of all records and monitoring intangible items. The process, which is needed to be followed while conducting a cost-benefit analysis, is as follows:

• Step 1: Specification of the set of available options: Identification and analysis of organisational policies.
• Step 2: Deciding whose benefits and costs are needed to be counted: Measurement of the national cost (Australian Government 2022).
• Step 3: Identification of the impacts and selection of measurement indicators: Identification of the incremental costs.
• Step 4: Prediction of the future impacts: Forecast analysis.
• Step 5: Monetising the impacts by placing dollar values: Current profit and loss analysis.
• Step 6: Discounting benefits and future costs for obtaining present value: Future cash flow analysis.
• Step 7: Computing the “Net Present Value (NPV)” of every option: NPV analysis.
• Step 8: Performing sensitivity analysis: Worst and best case analysis.
• Step 9: Reaching a conclusion: Summarising Cost-benefit analysis.

4. Explain how effective change management strategies can assist with embedding change in an organisation. Give an example of an effective change management strategy in your answer.

Change management can be defined as the way for ensuring the effectiveness of the changes which have been applied within the organisational processes, team and organisation. Three important phases of change management strategies are preparation for the changes, managing changes and reinforcing changes (Hiatt & Creasey 2012). Effective change management strategies are those which include the aspects of change management approaches or models. Effective change management strategies possess clear goals and objectives, due to which it becomes easy to embed changes within a company. Such strategies assist the employees of different business organisations in creating momentum by establishing visions related to the change so that all the employees can understand the necessity and requirement of implementing changes. In this context, it is necessary to create a coalition team whose members can effectively set a vision for organisational change by making decisions collaboratively. One of the finest examples of an effective change management strategy within an organisation is to provide training opportunities to the employees by maintaining effective communication (Krakoff 2022).

5. Outline one approach (or process) that can be used in the workplace to communicate and embed change.

Approach refers to the procedure through which the business organisations or individuals try to approach different tasks or projects so that some organisational activities can be dealt with (Cambridge Dictionary 2022). One of the most suitable processes or approaches, which can be utilised within the workplace for communicating and embedding change is the McKinsey 7-S principle. It can be defined as the tool for analysing the designs of the organisations, which consists of seven elements such as skill, strategy, structure, shared values, staff, style and system (McKinsey & Company 2008). The effective organizational structure can embed and communicate change, whereas the staff needs to be involved within the change management so that the overall organisational strategies for change can be developed. Effective technical infrastructure in terms of the systems can embed changes successfully by helping the staff to develop their skills and shared values. Lastly, a code of conduct is required to be considered in terms of style while embedding and communicating change.

6. Explain the risk management process. You may answer using a labelled diagram or in words (or both) and must include:

• a definition of risk management.
• A list or illustration of the steps in a risk management process.
• A description of what each step involves (including methods).

• Risk management can be defined as the procedure for controlling, evaluating and recognising threats or risks in terms of the earnings and capital of the organisations (Tucci 2021). One of the basic examples of risk management is risk analysis and mitigation.

• Steps involved with the risk management procedure are Step 1: Recognition of the risks, Step 2: Analysis of the risks, Step 3: Ranking and evaluation of the risks, Step 4: Treating the risks, and Step 5: Monitoring and reviewing the risks (Thomas 2020).

• Firstly, a risk breakdown structure can be utilised while recognising the risks present within the organisations. Secondly, the Delphi technique or other risk analysis methods can be used for analysing the risks. Thirdly, the Rank ratio or scoring method can be applied for ranking and evaluating the risks. Fourthly, loss prevention is one of the most effective methods for treating the risks, and lastly, a Risk audit can be done for monitoring and reviewing the risks.

7. Explain four options that an organisation may use to take to mitigate or control risks.

Four options, which a company may utilise for controlling and mitigating the risks, have been explained below:

• Risk Avoidance: If the risks present within a company raise negative consequences, then it is required to completely avoid those impacts (Schenkelberg 2019). In this context, the business activities involved with the risks can be stepped away for avoiding the occurrence of unwanted events. Additionally, business firms can create organisational procedures and policies for assisting the companies to avoid and foresee high-risk situations.

• Risk Acceptance: Another option available for controlling and mitigating the risks is to accept, whose consequences possess comparatively lower negative impacts. The probable loss from the accepted and identified risks is considered manageable. Accepting risks is not a mitigation approach as by this, the effects of the risks do not reduce.

• Risk Control or reduction: The probability of occurring the risks can be reduced or controlled with the help of hazard analysis and other risk assessment tools. The investment of money or funds is involved with this option for minimising the risks on the projects. One of the most suitable examples of risk control or reduction is to invest in highly skilled personnel of the projects for reviewing their scope and costing.

• Risk Transference: Transference is the option for shifting the burden associated with the consequences of the risks to other parties. One of the finest examples of this option is to outsource certain operations like customer services. Another procedure is to purchase insurance.

8. Explain three ways the benefits for organisational change can be promoted in a communication and education plan.

The three ways through which the advantages of organisational change can be promoted within an education and communication plan are as follows:

• Involvement of the employees within the change procedure: It is one of the most effective ways through which the benefit of organisational change, which is to develop the knowledge of the individuals, can be promoted within an education and communication plan (Sidman 2009). In this context, the leaders of different organisations can follow a democratic leadership style for involving all the employees within the decision-making process of organisational change.

• Promotion of teamwork through innovation: Another way is to promote teamwork through applying the benefit of organisational change, which is to encourage innovation so that the individuals can share their viewpoints and ideas in terms of an education and communication plan. Additionally, the members of different teams can be educated for participating within the education and communication plan by understanding organisational changes.

• Empowering employees by promoting skill development: The last way is to empower employees so that their skill development can be promoted as a part of an education and communication plan. In this context, support and assistance can be provided to the employees within each aspect of the organisational change and operations.

9. What is meant by "organisational behaviour", and how does it impact change strategies?

Organisational behaviour can be defined as the study regarding the interactions of the individuals within groups along with the investigation on how effectively they can maintain the business principles of their respective organisations. Organisational behavior impacts the change strategies by allowing the employees to implement changes based on their allocated roles and responsibilities within groups. Organisational behaviour also helps both employers and employees to think differently while making decisions for change strategies (iEduNote 2022). Business organisations, which are capable of taking risks while making decisions in terms of change strategies, can enhance creativity and innovation, which in turn, are influenced by organisational behaviour. Lastly, organisational behavior assists to motivate the performance of the employees, which is required enough while developing change strategies.

10. How does the external environment impact the change strategies used in an organisation? Provide an example to illustrate your answer.

The external environment can be defined as the collaboration of different conditions or factors which are outside of the companies, although it affects the internal activities and strategies of the businesses (Tipton 2022). Examples of the external environment are political, technological, social and economic factors. The external environment of different business organisations impacts the change strategies which are utilised within a company. Market conditions, including the current trends and changing requirements of the customers, is one of the most effective examples of the external environment, which can impact the change strategies. In this context, the organisations should also consider the organisational changes of their competitors for dealing with the current market conditions so that more effective and successful change strategies can be developed and executed. While considering the current market trends and changing preferences of the customers according to those trends, the companies can change their strategies so that more effective and successful results can be achieved.

11. List at least four components that should be included in a change management plan.

The four significant components, which should be involved within a change management plan, have been listed below:

• Leadership alignment: In this aspect, it is required to recognise the sponsors and leaders who are crucial to the effectiveness and success of the projects.

• Stakeholder engagement: All types of stakeholders like third parties, employees, and shareholders are needed to be engaged within the change management plan so that their support and influence for the process can be understood (Carracher 2022).

• Communication: Communication is one of the key components which should be involved with the plan so that an effective relationship amongst all the stakeholders can be maintained.

• Training: Provision of training opportunities is another required component, which can help the employees to adopt the new changes effectively.

References

 

Read More

CPCCCM2006 Apply Basic Lavelling Procedures Cookery Assignment Sample

1. What is meant by leveling in construction industry?

Levelling is a process used in the construction industry to ensure that a construction project is built with uniform accuracy (Savchyn, & Zyhar, 2020). It involves measuring and adjusting the elevation of the ground or base of a structure to ensure it is level, or flat. Levelling is important for the structural integrity of a building, as well as for aesthetic purposes.

2. What is included in levelling activities?

Levelling activities typically involve activities designed to reinforce a student’s current level of understanding and skills (Saaranen, Lehmuskoski, Takalo & Rouhiainen, 2021). These activities may include worksheets, quizzes, online games, and other interactive activities designed to help students practice and apply skills. They may also involve projects and tasks that assess a student’s understanding of a concept or skill.

3. Briefly describe the rise and fall method of leveling?

The rise and fall method for the assignment help of levelling is a surveying technique used to determine the difference in elevation between two points. It involves starting at the first point, then taking a series of measurements up and down the slope towards the second point (Pirti, & Hosbas, 2019). By taking multiple measurements, an average elevation can be determined. This method is used to calculate the elevation of points along a route and is the simplest method of topographic surveying.

4. Briefly describe the Height of collimation method of levelling.

The Height of Collimation method of levelling involves the use of a levelling instrument to take a series of measurements between two points (Herbert & Olatunji, 2020). A staff is held at each point and the height of the staff is measured using the instrument. The difference between the two staff heights is calculated and this is known as the Height of Collimation.

5. In the methods used in levelling calculations, the following abbreviations are used. Briefly describe these terms.

BS: Benchmark Survey: The benchmark survey is an initial survey of the land to be levelled. It is used to map out the overall terrain and to set the bench marks from which all other measurements will be taken (Pirti, & Hosbas, 2019).

IS: Intermediate Survey: The intermediate survey is the most important survey of the levelling process. This survey will measure the level of the land between the bench marks.

FS: Final Survey: The final survey is used to check for any errors that may have been made in the intermediate survey. It is used to confirm the accuracy of the levelling calculations.

6. Write down the processes for setting out construction tasks for levelling operations.

1. Consult the plans and specifications: Review the plans and specifications to determine the scope of the levelling operations and the desired results (Kuchmister, Goluch, Cmielewski, Rzepka & Budzyn, 2020).

2. Establish the levelling parameters: Establish the elevation and grade requirements for the levelling operations.

3. Determine the equipment needed: Determine the type of equipment and the quantity of personnel needed to complete the levelling operations (Pirti & Hosbas, 2019).

4. Establish a timeline: Establish a timeline for the completion of the levelling operations.

5. Create a plan of action: Create a plan of action for the levelling operations, including establishing the sequence of operations and scheduling work.

6. Allocate resources: Allocate personnel, equipment, and materials to complete the levelling operations.

7. Monitor progress: Monitor the progress of the levelling operations and make adjustments as needed to ensure the desired results are achieved.

7. What are the functions of the upper and lower stadia lines on an automatic level?

The upper stadia line on an automatic level is used to determine the height of an object. The lower stadia line is used to measure distances from the instrument (Savchyn & Zyhar, 2020). Both lines are used to measure distances, elevations, and heights.

8. What is the function of string line?

The string line is a tool used to mark a straight line on a surface. It is used to lay out construction projects and other tasks that require precise measurements and precise lines. It can also be used to hang and stretch fabric and other materials.

9. Briefly describe the following levels.

The different levels in construction are:

1. Foundation: This is the first and most important level of any construction project. It involves laying the groundwork for the entire structure. This includes digging trenches, pouring concrete, installing footings, and setting up the foundation walls.

2. Framing: This is the second step in building a structure. It involves the installation of structural elements such as beams, joists, walls, floors, and roofs.

3. Finishing: This is the final step of construction. It involves installing the finishes, such as drywall, trim, doors, windows, floor coverings, and paint.

10. List at least five hazards which may be present on site while carrying out leveling operations.

1. Slips, trips, and falls.

2. Struck by falling objects.

3. Exposure to hazardous chemicals or materials.

4. Exposure to loud noise.

5. Exposure to dust and debris.

11. Briefly describe three levelling techniques commonly used in construction work.

1. Dumpy Level: The dumpy level is one of the most commonly used levelling techniques in construction. It is an optical surveying instrument used to measure the height differences between two points. It consists of a telescope mounted on a tripod and a graduated staff. It is used to accurately measure the height of points, determine the differences in elevation between two points and to set a benchmark for further work.

2. Laser Level: Laser levels are also commonly used in construction work. They use laser beams to accurately measure the level of a surface and transfer it onto another surface (Aryan, Bosché & Tang, 2021). They are typically used for jobs that involve plumbing, tiling, and constructing walls and ceilings.

3. Water Level: A water level is a simple, yet effective levelling tool used in construction. It consists of a clear plastic tube with water in it. It is used to check if two points are at the same level by connecting the two points with the tube and observing the water level. It is often used for levelling in a variety of construction projects, such as foundations, decks, and other structures.

12. List 5 types of information that can assist levelling planning and preparation.

1. Accurate and up-to-date surveys of the building or area.

2. Specifications of the materials and tools required for the job.

3. Detailed diagrams and drawings of the area to be levelled.

4. Appropriate safety guidelines and regulations.

5. Local weather conditions and forecasts.

13. While interpreting construction plans, drawings and sketches used on site, the following construction terminology is used. Briefly describe the below given terminology.

1. Information block:

An information block in construction planning is a block of data that provides the basic information about a construction project (Chen et al., 2021). This information is typically used by the project team to help plan, estimate, and track the project's progress. Information blocks usually include details such as the project name, location, estimated budget, timeline, scope, and other relevant details.

2. Title Block:

Title block is a small area located at the bottom of a construction drawing that includes information about the drawing such as the drawing title, the drawing number, the scale of the drawing, the date it was created, the names of the people involved in creating the drawing, and the company or organization who created the drawing.

3. Revision block:

A revision block is a type of construction planning tool used to help project managers track and control the changes that occur throughout the course of a construction project. It is essentially a log of all modifications to the construction plan, including the date and purpose of each alteration.

4. Lines:

Lines in construction planning refer to the boundaries of a particular project or work area. They are usually drawn on a plan or a map and are used to define the scope of the project and the limits of responsibility for each party involved (Chen et al., 2021). This is an important part of planning for any construction project and helps to ensure that the project is completed on time, within budget, and with the desired results.

14. What are the four categories of symbols in construction drawings?

1. Lines: Solid, dashed, and dotted lines are used to represent different features in construction drawings.

2. Dimensions: Dimensions are used to indicate the exact sizes and placement of elements in the drawing (Chen et al., 2021).

3. Symbols: Symbols are used to represent specific objects and activities, such as doors, windows, and plumbing fixtures.

4. Text: Text is used to provide labels, instructions, and additional information about the drawing.

15. Briefly describe the job safety analysis.

Job safety analysis (JSA) is a systematic examination of a task or job to determine the potential hazards and associated risks, and to identify the procedures to eliminate or control those hazards and risks (Palega, 2021). It involves the identification of hazards, the assessment of risks, and the implementation of control measures to eliminate or minimize the risks. JSA's are used to ensure that the job is carried out safely and to identify any potential hazards or risks that may arise from the job.

16. What are the contents and terms used in JSA?

- Hazard: A source of potential harm or danger.

- Risk: The potential for injury, illness, or property damage due to exposure to a hazard (Herlina, Dewantari, Sonda & Mulyana, 2022).

- Control Measures: Steps taken to reduce the risk of harm from a hazard.

- Engineering Control: Physical or mechanical measures taken to eliminate or reduce the potential for harm from a hazard.

- Administrative Control: Policies, procedures, and practices put in place to minimize the risk of hazard.

Some other words used are Training, Monitoring and PPE.

17. Briefly describe the safe work method statements (SWMS)

Safe Work Method Statements (SWMS) are written documents outlining the safety steps, hazards, and risks associated with a particular job, task, or activity (Australian Government Authority, 2021). They also include the control measures to be taken to minimise the risks associated with the job, task, or activity. SWMS must be prepared prior to the commencement of any high-risk construction work.

18. What are the contents and terms used in SWMS?

Common terms used in SWMS documents include:

- Risk assessment: The process of identifying, assessing and controlling hazards associated with a work activity.

- Control measures: Actions taken to eliminate, reduce or control risks associated with a work activity (Ahn, Crouch, Kim, & Rameezdeen, 2020).

- Hazardous manual tasks: Activities involving lifting, pushing, pulling, carrying, or otherwise handling or moving objects.

- Personal protective equipment (PPE): Protective clothing, helmets, goggles, gloves, and other items designed to protect the worker from injury or illness arising from exposure to hazards (Herlina, Dewantari, Sonda & Mulyana, 2022). .

- Emergency procedures: Plans and procedures that outline what actions should be taken in the event of an emergency.

19. What is the difference between JSA and SWMS?

JSA (Job Safety Analysis) is a form of risk assessment that looks at the specific tasks of a job, the hazards associated with those tasks, and the measures needed to control the risks. SWMS (Safe Work Method Statement) is a document that outlines the proposed safe work methods to be used when carrying out a specific task or job (Pillay & Tuck, 2021). It includes a list of the steps in the job, any hazards and risks associated with each step, and the measures to be taken to control them. The SWMS then forms part of the JSA

Read More

Sample Category

Assignment Services